02 6024 2292

193 Melbourne Road, Wodonga VIC 3690

Follow us on Facebook

Follow us on YouTube

193 Melbourne Road, Wodonga VIC 3690

Follow us on Facebook

Follow us on YouTube

Scaffold, Mobile 1.2m x 2.4m

To ensure safety and stability while working or moving your scaffold on uneven or rough ground these scaffolds are supplied with robust 200mm swivel castors with directional brakes.

The Tuff Scaff has a variety of frame configurations that can provide versatility to you, in terms of building a long scaffold or even multiple scaffolds with the addition of base jacks or castors.

The scope of work is always open with the mobile scaffold system as a walk through system is available upon special request.

1.2m Wide (Double Width) and 2.4m long these scaffolds have been tested and approved to meet the Medium Duty requirements of Australian and New Zealand Standards which consists of a safe working load of 450kg per bay, per working level.

Hire Rates (including GST)

Day $65
Weekend $95
Week (5 Days) $275

Scaffold, Mobile 1.2m x 2.4m

Category:

Documentation

Documentation